Scheduling with the Probabilistic Coupling Method II (PTCM II) – assuming continuity of work on the working sectors
Artykuł w czasopiśmie
MNiSW
100
Lista 2024
| Status: | |
| Autorzy: | Kostrzewa-Demczuk Paulina, Rogalska Magdalena |
| Dyscypliny: | |
| Aby zobaczyć szczegóły należy się zalogować. | |
| Rok wydania: | 2024 |
| Wersja dokumentu: | Drukowana | Elektroniczna |
| Język: | angielski |
| Numer czasopisma: | 4 |
| Wolumen/Tom: | 70 |
| Strony: | 505 - 520 |
| Impact Factor: | 1,0 |
| Web of Science® Times Cited: | 0 |
| Scopus® Cytowania: | 0 |
| Bazy: | Web of Science | Scopus | BazTech |
| Efekt badań statutowych | NIE |
| Materiał konferencyjny: | NIE |
| Publikacja OA: | TAK |
| Licencja: | |
| Sposób udostępnienia: | Otwarte czasopismo |
| Wersja tekstu: | Ostateczna wersja opublikowana |
| Czas opublikowania: | W momencie opublikowania |
| Data opublikowania w OA: | 16 grudnia 2024 |
| Abstrakty: | angielski |
| Effective planning is crucial in the construction sector to ensure projects are completed on time and on budget. However, the construction industry faces various challenges that can complicate the planning process. There are often delays, exceedances of the baseline and increases in investment costs. One planning method is Time Couplings Methods (TCM), which can be improved using predictive multivariate statistical model method (MMSM) construction process times and standard deviations. A new scheduling method in the probabilistic approach was developed – Probabilistic Time Couplings Method II (PTCM II). In PTCM II, the priority is to maintain the continuity of work on working sectors, because sector downtime is unfavorable and extends the investment implementation time. The work presents a case study and compares it with other planning methods and with the real time of the considered investment. he results clearly indicate that the developed methodology is correct, provides good mapping and can be successfully used in planning construction works. |