Operational optimisation of the medium-voltage network containing renewable energy sources and energy storage
Artykuł w czasopiśmie
MNiSW
100
Lista 2024
| Status: | |
| Autorzy: | Pijarski Paweł, Tolvaišienė Sonata, Przepiórka Dominik, Vanagas Jonas, Wiśniowski Jarosław |
| Dyscypliny: | |
| Aby zobaczyć szczegóły należy się zalogować. | |
| Rok wydania: | 2026 |
| Wersja dokumentu: | Elektroniczna |
| Język: | angielski |
| Numer czasopisma: | 5 |
| Wolumen/Tom: | 16 |
| Numer artykułu: | 2489 |
| Strony: | 1 - 21 |
| Impact Factor: | 2,5 |
| Web of Science® Times Cited: | 0 |
| Bazy: | Web of Science |
| Efekt badań statutowych | NIE |
| Materiał konferencyjny: | NIE |
| Publikacja OA: | TAK |
| Licencja: | |
| Sposób udostępnienia: | Witryna wydawcy |
| Wersja tekstu: | Ostateczna wersja opublikowana |
| Czas opublikowania: | W momencie opublikowania |
| Data opublikowania w OA: | 4 marca 2026 |
| Abstrakty: | angielski |
| The rapid growth of renewable electricity generation introduces technical challenges that were previously uncommon. These include, for example, problems with exceeding the permissible voltage values in network nodes, overloading of transformers and line sections located behind the transformer, as well as balance problems. This article proposes an original methodology for eliminating these problems. Four objective functions reflecting different operator priorities were used. Attention is drawn to the increasing importance of the development of electricity storage. The results confirm that coordinated optimisation of voltage regulation, energy storage, and flexible load management enables increased renewable energy connection capacity while reducing power losses and improving the grid voltage profile. The case study results demonstrate the effectiveness of the proposed approach under the considered operating scenarios. The proposed tool can support network operators in managing MV grid operation under the considered scenarios. The ongoing energy transition requires network operators to react quickly to emerging problems. Therefore, advanced computational methods are needed to mitigate operational risks and respond to emerging constraints. |